Saturday, 31 December 2011
Thursday, 29 December 2011
HR Coil with Improved shape and width control after December'2011 Capital Repair at R.S.P.
Strapped HR Coil, ready for loading
HR Coil loaded on Rail (BRN Wagon)
HR Coil loaded on Rail (BRN Wagon)
HR Coil loaded on Rail (BRN Wagon)
Strapped HR Coil lying on the loading bay.
Stacked HR Coil waiting for eye and circumferential strapping on the loading bay.
Stacked HR Coil waiting for eye and circumferential strapping on the loading bay.
Stacked HR Coil waiting for eye and circumferential strapping on the loading bay.
Hot HR Coil on the way out of the coiler
Hot HR Coil on the way out of the coiler
Hot HR Coil moving out to cooling bay.
Hot HR Coil moving out to cooling bay.
Subscribe to:
Posts (Atom)